One claim, tracked over time with full provenance. Every number on this page links to a specific page and table in an official HART document — and every change is logged.
A structured, auditable record — each metric drawn from the same primary source and labeled as reported or derived.
The same incurred figure ($6.75B) produces two different percentages depending on the denominator. We show both, clearly labeled, rather than picking one.
The point of a truth map is that you don't have to take our word for it. Every number traces to these sources.
HART official document · p.34, Table: 2022 Recovery Plan Budget Estimate at Completion. Retrieved June 2026.
View HART reports →Google Sheet with page and section references for each metric. The source of truth for displayed numbers and their citations.
View sheet →Every revision is preserved — never overwritten. This is the record that lets the claim be trusted over time.
Cumulative incurred costs through the reporting cutoff, per HART's Monthly Progress Report definition. The MPR may specify inclusions/exclusions (e.g. third-party reimbursement costs); we adopt the definition as stated in the cited source.
A derived value from the same primary-source table: Current Forecast "Total Project Cost" − "Incurred to Date." We label this as derived unless the primary source explicitly reports a "cost to complete" line item.
Each number links to a specific page and section in an official HART document. Any change produces a visible, auditable log entry. That is what trust with memory looks like in practice.